In line with the requirements defined in the Master Plan, the table below present the document deliverables of the project:
No. |
Deliverable name | WP | Lead participant | Dissemination |
Delivery date |
D0.1 | Final Report | 0100 | GMV | PU | T0+27 (FP) |
D1.1 | Technology Review Document | 1100 | BAS | PU | T0+2 |
D1.2 | System Requirements Document | 1200 | GMV | PU | T0+3 (SRR) |
D1.3 | Interface Control Document (v2) | 1200, 2100 to 2500 | GMV | PU | T0+9 (PDR) |
D2.1 | Preliminary Design Document | 1200, 2100 to 2500 | GMV | PU | T0+9 (PDR) |
D4.3 | ERGO User Manual | 4100 to 4500, 4700 | GMV | PU | T0 + 22 (TRR) |
D5.1 | Planetary Exploration Test Report | 5100 | GUK | PU | T0+24 (FA) |
D5.2 | Orbital Test Report | 5300 | GMV | PU | T0+24 (FA) |
D5.3 | Evaluation of Test Results | 5200, 5400 | GMV | PU | T0+27 (FP) |
D6.1 | Dissemination Plan | 6100 to 6300 | KCL | PU | T0+4 (SRR+1) |
D6.2 | Exploitation Plan | 6400 | GMV | PU | T0+27 (FP) |
D6.3 | Publications | 6200 | KCL | PU | – |
Table 3‑2: Document Deliverables list